ITECSA

Switzerland · 21 Employees
Large and small-scale project management from experienced engineers, working towards a sole objective: look beyond, to discover the best way forward. We have put ourselves into play, employing great sensitivity and creativity in order to win the competition. This aspect, which is often underestimated, has permitted us to gain a full understanding of our clients' requirements, enabling us to model our proposals based on three criteria: 1) competitive pricing, 2) professionalism in the form of multidisciplinary teams capable of following all thetheoretical and practical aspects of a project and 3) enthusiasm. Major projects AlpTransit: Ceneri Tunnel (two 15.4 km tubes; 40 km of tunnels and caverns in total). Motorway projects for the Swiss Federal Roads Office (FEDRO): Refurbishment of 4.5 km of the Generoso stretch of the A2 motorway and of approx. 10 km from Gentilino to Lamone. Support and specialist consulting: Refurbishment of 10.5 km of the Leventina motorway and 5.0 km of the Mendrisio motorway, inspection of structures and tunnels, worksite supervision of electro-mechanical installations in the AlpTransit Gotthard Base Tunnel.

概述

国家 Switzerland
成立时间 1991
总部 via Besso 7, Lugano, 6900, CH
电话号码
网站 http://www.itecsa.ch
LinkedIn http://www.linkedin.com/company/itecsa
Twitter
Facebook
员工数 21
行业 civil engineering,
简介 Large and small-scale project management from experienced engineers, working towards a sole objective: look beyond, to discover the best way forward. We have put ourselves into play, employing great sensitivity and creativity in order to win the competition. This aspect, which is often underestimated, has permitted us to gain a full understanding of our clients' requirements, enabling us to model our proposals based on three criteria: 1) competitive pricing, 2) professionalism in the form of multidisciplinary teams capable of following all thetheoretical and practical aspects of a project and 3) enthusiasm. Major projects AlpTransit: Ceneri Tunnel (two 15.4 km tubes; 40 km of tunnels and caverns in total). Motorway projects for the Swiss Federal Roads Office (FEDRO): Refurbishment of 4.5 km of the Generoso stretch of the A2 motorway and of approx. 10 km from Gentilino to Lamone. Support and specialist consulting: Refurbishment of 10.5 km of the Leventina motorway and 5.0 km of the Mendrisio motorway, inspection of structures and tunnels, worksite supervision of electro-mechanical installations in the AlpTransit Gotthard Base Tunnel.

技术

Microsoft Office 365

Other

Nginx

Load Balancers

Outlook

Email Providers

常见问题

ITECSA 在哪里?

ITECSA 的总部位于 via Besso 7, Lugano, 6900, CH

ITECSA 的电话号码是多少?

ITECSA 的电话号码是

ITECSA 的官方网站是什么?

ITECSA 的公司官方网站是 http://www.itecsa.ch

ITECSA 是做什么的?

ITECSA 的业务有哪些?

tunnels,construction sites,railways,highways,buildings,bridges

ITECSA 的年收入是多少?

ITECSA 的收入是 0美元

ITECSA 有多少员工?

ITECSA 有 21 名员工

ITECSA 属于哪个行业?

ITECSA 从事以下行业: civil engineering

ITECSA 使用什么技术?

ITECSA 使用的一些流行技术包括: Microsoft Office 365,Nginx,Outlook

如何联系 ITECSA?

ITECSA 联系信息: 电话号码:, 网站:http://www.itecsa.ch, 邮箱:ema***@***.com

ITECSA 的社交媒体链接是什么?

ITECSA 领英:http://www.linkedin.com/company/itecsa,fackbook:,twitte:

ITECSA 是一家上市公司吗?

不是

ITECSA 的最后一轮融资是什么时候?

暂无最近投资信息

谁投资 ITECSA?

ITECSA 有 0 家投资者,包括 。

管理层

Cristian Zapata

Area Marketing Manager

Adriana Soliz

External plant supervisor and customer service

外贸获客 查找关键决策人

10亿+海关交易数据,1.2亿企业数据,2亿+企业联系人数据,1000千万真实采购商。覆盖200+个国家及地区,95%外贸重点拓展市场,可根据行业、经营范围等多方位挖掘目标客户。
免费试用

Top-ranked on G2 Crowd

全球B2B企业库 海关贸易数据 展会采购数据

工作更少,成就更大,销售更聪明

查找更多 B2B 联系人,丰富并验证记录
Email Address

全球B2B企业库

海关贸易数据

展会采购数据

Top-ranked on G2 Crowd

OR
Sign Up with Google