FEROINVEST DOO
Macedonia (FYROM) · 32 Employees
FEROINVEST offers turn-key solutions for hydropower projects including:
- Feasibility studies;
- Due diligence reports;
- Detailed design projects for HPP's (civil works, architecture, electro-mechanical);
- Designing and manufacturing of electro-mechanical equipment;
- Designing of HPP automation;
- Optimization of solution for connecting to the distributive network;
- Installation, testing and commissioning of the equipment;
- 24/7 monitoring of the HPP's;
- Maintenance;
FEROINVEST is a group of several companies in renewable energy sector, established in 2003 with over 1000 employees.
- BRAKO
o metalworking industry (located in Veles, Macedonia and Panchevo, Serbia);
- Energy Maintenance Solutions (EMS)
o Designing, installation, testing, commissioning, monitoring and maintenance of HPP electro-mechanical equipment;
o inspection body that is performing periodic and annual testing of electrical equipment and electrical power plants;
o ISO 17020 certificate of technical inspection and periodic testing of power plants and electrical equipment, including: Generators, Engines, Power Transformers, Instrument Transformers, Switches, Surge Arresters, Condensers, Lightning Protection and Grounding, Relay Protection, Batteries, Electrical Installation, etc.;
o Parametrization and testing of numerical relay protection;
- Aquawatt
o leading designing and planning office in Macedonia, specialized in the design and implementation of small hydropower plants;
o over 130 detail design projects for HPP's;
o feasibility studies and due diligence reports
We are market-leader in Hydropower solutions, owner of 25 small HPP's in Macedonia with installed power of 22,7 MW. So far, we have successfully delivered and commissioned electro-mechanical equipment for over 40 projects in Macedonia, Kosovo, Georgia, Montenegro.
查看员工