电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
Mainstream Energy Solutions Limited (MESL) is the concessionaire of Kainji and Jebba Hydro Power Plants (HPP) with an installed capacity of 760MW and 578.4MW respectively and a total installed capacity of 1338.4MW. The two hydro plants are 100km apart with Kainji dam being on the upstream of Jebba both drawing water from the same source, Niger River. Upon takeover in November 2013, the total available capacity of the two plants was 582MW. As of today, MESL has proudly restored capacity of up to 922MW over the course of three years. We generate on average 20 percent of Nigeria's power. Kainji was commissioned as Nigeria's first Hydro Power Plant in 1968. Located downstream from Kainji is the Jebba Power Plant which was commissioned in 1985. The turbines in the Power Plants are Kaplan adjustable and fixed blade types. MESL is a privately-owned company being governed by a Board of Directors and Executive Management that oversee the day to day operations of the plants.
公司 | Mainstream Energy Solutions Limited |
---|---|
职位 | Engineer |
地点 | Nigeria |
http://www.linkedin.com/in/haruna-abubakar-tata-60a2009b | |
部门 | master_engineering_technical |
头衔 | Engineer at Mainstream Energy Solution |
Haruna Tata 在 Mainstream Energy Solutions Limited 担任 Engineer at Mainstream Energy Solution
Haruna Tata 在 Mainstream Energy Solutions Limited 的职位是 Engineer at Mainstream Energy Solution
Haruna Tata 的电子邮件地址是 ema***@***.com
Haruna Tata 的电话号码是 -
Haruna Tata 的公司电话号码是 +234****
Haruna Tata 在 semiconductors 工作。
Haruna Tata 的一些同事包括Eng Audu、Ebele Ukpaka、Jose Garcia、Merga TesoAbdulkadir Yerima、。
Haruna Tata联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Haruna Tata 的个人领英是:http://www.linkedin.com/in/haruna-abubakar-tata-60a2009b
Haruna Tata 的办公地点:yedseram cres, abuja, federal capital territory, nigeria
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd