电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
Fauji Kabirwala Power Company Limited is an IPP having an installed capacity of 157MW comprising of two Siemens Westing House Gas Turbines and One Siemens Westing House Steam Turbine. The gas turbines operate on LBTU and HBTU gas. To increase the steam turbine capacity duct firing is used in the HRSGs. The company sells its production to WAPDA which is the National Distribution Authority in Pakistan.
公司 | FKPCL KABIRWALA |
---|---|
职位 | APO |
地点 | Pakistan |
http://www.linkedin.com/in/israr-tahir-a86b4655 | |
部门 | |
头衔 | APO at FKPCL KABIRWALA |
Israr Tahir 在 FKPCL KABIRWALA 担任 APO at FKPCL KABIRWALA
Israr Tahir 在 FKPCL KABIRWALA 的职位是 APO at FKPCL KABIRWALA
Israr Tahir 的电子邮件地址是 ema***@***.com
Israr Tahir 的电话号码是 -
Israr Tahir 的公司电话号码是 -
Israr Tahir 在 oil & energy 工作。
Israr Tahir 的一些同事包括Salman Safdar、Muhammad Rind、Fauji Bhatti、Syed ShahIsrar Tahir、。
Israr Tahir联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Israr Tahir 的个人领英是:http://www.linkedin.com/in/israr-tahir-a86b4655
Israr Tahir 的办公地点:17 km jhand road, near adda chopperhatta, kabirwala, punjab, pakistan
Top-ranked on G2 Crowd
全球B2B企业库 海关贸易数据 展会采购数据
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd