电子邮件 | moh***@***.***.ng | 获取Email |
---|
电子邮件 | moh***@***.***.ng | 获取Email |
---|
Mainstream Energy Solutions Limited (MESL) is the concessionaire of Kainji and Jebba Hydro Power Plants (HPP) with an installed capacity of 760MW and 578.4MW respectively and a total installed capacity of 1338.4MW. The two hydro plants are 100km apart with Kainji dam being on the upstream of Jebba both drawing water from the same source, Niger River. Upon takeover in November 2013, the total available capacity of the two plants was 582MW. As of today, MESL has proudly restored capacity of up to 922MW over the course of three years. We generate on average 20 percent of Nigeria's power. Kainji was commissioned as Nigeria's first Hydro Power Plant in 1968. Located downstream from Kainji is the Jebba Power Plant which was commissioned in 1985. The turbines in the Power Plants are Kaplan adjustable and fixed blade types. MESL is a privately-owned company being governed by a Board of Directors and Executive Management that oversee the day to day operations of the plants.
公司 | Mainstream Energy Solutions Limited |
---|---|
职位 | civil servant |
地点 | Nigeria |
http://www.linkedin.com/in/mohammed-bawa-953073b8 | |
部门 | |
头衔 | Mainstream Energy Solutions Limited |
Mohammed Bawa 在 Mainstream Energy Solutions Limited 担任 Mainstream Energy Solutions Limited
Mohammed Bawa 在 Mainstream Energy Solutions Limited 的职位是 Mainstream Energy Solutions Limited
Mohammed Bawa 的电子邮件地址是 moh***@***.***.ng
Mohammed Bawa 的电话号码是 -
Mohammed Bawa 的公司电话号码是 +234****
Mohammed Bawa 在 semiconductors 工作。
Mohammed Bawa 的一些同事包括Eng Audu、Ebele Ukpaka、Jose Garcia、Merga TesoAbdulkadir Yerima、。
Mohammed Bawa联系方式: 电子邮件地址:moh***@***.***.ng 电话号码:-
Mohammed Bawa 的个人领英是:http://www.linkedin.com/in/mohammed-bawa-953073b8
Mohammed Bawa 的办公地点:yedseram cres, abuja, federal capital territory, nigeria
Top-ranked on G2 Crowd
全球B2B企业库 海关贸易数据 展会采购数据
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd