电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
The Contra Costa Water District serves water to 500,000 people in central and eastern Contra Costa County near the San Francisco Bay Area. About 265,000 people receive treated water directly from CCWD, and the rest receive water the Water District delivers to six local agencies. CCWD draws its water from the Sacramento-San Joaquin Delta under a contract with the federal Central Valley Project (CVP), and as such is particularly concerned about Delta water quality and the Delta environment. CCWD is the CVP's largest urban contractor. In 1998, the water district completed construction of the locally-financed $450 million Los Vaqueros Project, including a 100,000 acre-foot reservoir, designed to provide improved water quality and emergency supply reliability for CCWD customers as well as net environmental benefits. In 2012, the reservoir was enlarged to a capacity of 160,000 acre-feet.
公司 | Contra Costa Water District |
---|---|
职位 | Construction Inspector |
地点 | United States |
部门 | master_operations |
头衔 | Construction Inspector at Contra Costa Water District |
Ray P 在 Contra Costa Water District 担任 Construction Inspector at Contra Costa Water District
Ray P 在 Contra Costa Water District 的职位是 Construction Inspector at Contra Costa Water District
Ray P 的电子邮件地址是 ema***@***.com
Ray P 的电话号码是 -
Ray P 的公司电话号码是 +192****
Ray P 在 utilities 工作。
Ray P 的一些同事包括Oliver S、Andrea J、Yolanda B、Ray PJoy Y、。
Ray P联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Ray P 的个人领英是:
Ray P 的办公地点:1331 Concord Ave, Concord, CA 94520, US
Top-ranked on G2 Crowd
全球B2B企业库 海关贸易数据 展会采购数据
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd