电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
Organizations come to Sprung when they need a superior alternative to conventional construction approaches. What is your organization's need: Speed of Construction? Lower Costs? Flexibility of Design? Durability? Longevity? SPEED: Our buildings can be put up in a fraction of the time it takes for a conventional structure, saving time and money and putting you in business in days rather than months. Sprung was called into Ground Zero after the September 11 attacks and was able to build a structure by November that was used by more than 600,000 recovery workers. LOWER COSTS: Construction delays equal cost overruns. Sprung solutions accelerate construction, lower project costs and reduce operating expenses. The Edge School in Calgary was able to save $7 million on costs in an expansion that conventional construction put out of its reach financially. FLEXIBILITY: Your building can evolve as your needs do, changing in size or location. One Sprung structure was originally built as an arena, then sold and refitted as a vehicle maintenance and training facility, and sold and moved again as a bus maintenance facility. DURABILITY: Sprung buildings are designed to handle the most inhospitable places on Earth, from heavy snow loads to hurricane force winds. A Sprung structure in New Orleans withstood the 100+mph winds of Hurricane Katrina while conventional buildings were destroyed. LONGEVITY: Sprung's all-aluminum substructure is guaranteed for a period of 30 years with a life expectancy of 50+ years. The membrane panels are guaranteed for up to 20 years with a life expectancy of 25+ years, and can be re-fabricated to provide another 25 years. Our salesmen are committed to your project for its full life-cycle, from start to final walkthrough, and follow-ups for five years after completion. Call (toll-free) 1.800.528.9899 to discuss a solution, see our Showcase Pages for featured markets or visit www.sprung.com for more information.
公司 | Sprung Structures |
---|---|
职位 | Production Manager |
地点 | United States |
http://www.linkedin.com/in/chris-whipp-6045596a | |
部门 | master_operations |
头衔 | Production Manager at Sprung Instant Structures. Officer In Charge at US Navy, NMCB 18, Detachment Salt Lake City |
Sprung Structures Production Manager
2019-01-01 -
US Navy Officer In Charge
2018-08-01 -
U.S. Navy Reserve Chief Petty Officer
2006-07-01 -
Salt Lake County Retired Deputy Sheriff
1999-03-01 - 2019-04-01
Bonneville Machine Welder
1995-04-01 - 1998-01-01
Chris Whipp 在 Sprung Structures 担任 Production Manager at Sprung Instant Structures. Officer In Charge at US Navy, NMCB 18, Detachment Salt Lake City
Chris Whipp 在 Sprung Structures 的职位是 Production Manager at Sprung Instant Structures. Officer In Charge at US Navy, NMCB 18, Detachment Salt Lake City
Chris Whipp 的电子邮件地址是 ema***@***.com
Chris Whipp 的电话号码是 -
Chris Whipp 的公司电话号码是 +180****
Chris Whipp 在 construction 工作。
Chris Whipp 的一些同事包括Bart Ells、Barry Cruse、Ahmed Hassani、Rob EkbladKurt L、。
Chris Whipp联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Chris Whipp 的个人领英是:http://www.linkedin.com/in/chris-whipp-6045596a
Chris Whipp 的办公地点:80039 418 avenue, aldersyde, alberta, canada
Top-ranked on G2 Crowd
全球B2B企业库 海关贸易数据 展会采购数据
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd