电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
The Bridge Power Project is a 424 MW gas-fired generation project under development in Tema, Ghana, by Early Power Limited, a Ghanaian company. Early Power is sponsored by a multinational consortium comprised of Endeavor Energy, General Electric (GE) and Sage Petroleum Limited, all well-known in the energy sector for delivering sustainable, reliable and competitively-priced energy solutions in developing countries. To be located in the Tema Heavy Industrial Area, the project includes the development of power plant facilities in two stages: Stage 1 and Stage 2, a 9 km+ pipeline for transporting liquefied petroleum gas (LPG), an LPG storage tank farm, and additional pipelines for transporting raw water and diesel to the project site. The plant will generate electricity using LPG as its primary fuel. Within five years of it becoming operational, we anticipate that the plant will switch to Natural Gas (NG) as its primary fuel, should it be made available by the Government of Ghana. Diesel is the backup fuel in the event gas is unavailable. On completion of Stage 2, the full power plant output capacity will be approximately 424MW. The Project is being developed in two stages on an accelerated timeline and consists of the following: Stage 1: 202 MW power block consisting of 5 General Electric TM2500+ gas turbines and 1 purpose-built GE steam turbine in Combined Cycle Gas Turbine (CCGT) configuration Stage 2: 222 MW power block consisting of 4 General Electric LM6000 gas turbines and 1 purpose-built GE steam turbine in CCGT configuration
公司 | Early Power Limited (Bridge Power Project) |
---|---|
职位 | Electrical Control & Instrumention Technician |
地点 | Ghana |
http://www.linkedin.com/in/eli-afeku-4a294050 | |
部门 | master_engineering_technical |
头衔 | Electrical Control & Instrumention Technician |
Early Power Limited (Bridge Power Project) Electrical Control & Instrumention Technician
2019-07-01 -
Instrumentation and Control Technician
2015-11-01 - 2019-07-01
System Administrator
2009-08-01 - 2019-07-01
Electrical / IT Technician
2007-01-01 - 2009-02-01
Network Technician
2005-01-01 - 2007-01-01
Eli Afeku 在 Early Power Limited (Bridge Power Project) 担任 Electrical Control & Instrumention Technician
Eli Afeku 在 Early Power Limited (Bridge Power Project) 的职位是 Electrical Control & Instrumention Technician
Eli Afeku 的电子邮件地址是 ema***@***.com
Eli Afeku 的电话号码是 -
Eli Afeku 的公司电话号码是 +233****
Eli Afeku 在 utilities 工作。
Eli Afeku 的一些同事包括James Salifu-Kozak、Martha Boamah、Francis Kojo、Eli AfekuJoseph Baiden、。
Eli Afeku联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Eli Afeku 的个人领英是:http://www.linkedin.com/in/eli-afeku-4a294050
Eli Afeku 的办公地点:91 Osu Badu Street, West Airport, Accra, Greater Accra N/A, GH
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd