电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
PT Mass Rapid Transit Jakarta (PT MRT Jakarta) was established on June 17, 2008 as Limited Liability Company with a majority of shares owned by the Provincial Government of DKI Jakarta as much as 99.98% and the rest is owned by PD Pasar Jaya as much as 0.02%. The scope of work of PT MRT Jakarta including the construction of MRT infrastructure and facilities, to operate and maintain infrastructure and facilities, as well as develop and manage property / business in Depo Lebak Bulus, stations and surrounding areas. MRT Jakarta development plan has actually been initiated since 1985. But only in 2005, the project was acknowledged as national project by President of the Republic of Indonesia. Phase 1 MRT Jakarta project was fully financed by Japan Bank for International Cooperation (JBIC) which is merged with Japan International Cooperation Agency (JICA) later on. JICA acts as an assessment team and JBIC as a lender. The project design was started in 2008-2009, and the construction phase was started in October 2013 with the target of finishing at the end of 2018. MRT Jakarta Phase 1 will operate in March 2019, with the route approximately 16 kilometers from Lebak Bulus, South Jakarta to Bundaran Hotel Indonesia, Central Jakarta. At Phase 1, it will be consisting of 7 elevated stations: Lebak Bulus, Fatmawati, Cipete Raya, Haji Nawi, Blok A, Blok M, Sisingamangaraja and 6 underground stations: Senayan, Istora, Bendungan Hilir, Setiabudi, Dukuh Atas, Bundaran Hotel Indonesia. With target of > 200,000 passengers in a day and flexibility to manage Transit Oriented Development (TOD) around the station area, MRT Jakarta optimists to be one of the leading rail-based transportation companies in Indonesia for safety, reliability, customer service and time efficiency.
公司 | PT. MRT Jakarta |
---|---|
职位 | Operation Control Centre Department Head |
地点 | Indonesia |
http://www.linkedin.com/in/fairus-jujur-setiawan-24140322 | |
部门 | |
头衔 | Operation Control Centre Department Head |
PT. MRT Jakarta Operation Control Centre Department Head
2022-09-01 -
PT. MRT Jakarta Chief Traffic Dispatcher
2018-06-01 - 2022-09-01
Qatar Airways Flight Documentation - Ground Staff
2013-07-01 - 2018-06-01
Ramp Supervisor/ Flight Dispatcher
2012-08-01 - 2013-08-01
Professional Staff Marketing
2011-12-01 - 2012-08-01
Fairus Setiawan 在 PT. MRT Jakarta 担任 Operation Control Centre Department Head
Fairus Setiawan 在 PT. MRT Jakarta 的职位是 Operation Control Centre Department Head
Fairus Setiawan 的电子邮件地址是 ema***@***.com
Fairus Setiawan 的电话号码是 -
Fairus Setiawan 的公司电话号码是 +622****
Fairus Setiawan 在 transportation/trucking/railroad 工作。
Fairus Setiawan 的一些同事包括Achmad Handryanto、Akhmad Fatkhurohman、Rizky Ikhsani、Achmad HamzahRizki Diani、。
Fairus Setiawan联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Fairus Setiawan 的个人领英是:http://www.linkedin.com/in/fairus-jujur-setiawan-24140322
Fairus Setiawan 的办公地点:Jl. M.H. Thamrin 59, Jakarta , DKI Jaya 10350, ID
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd