电子邮件 | ler***@***.***.id | 获取Email |
---|
电子邮件 | ler***@***.***.id | 获取Email |
---|
The Badak LNG Project began when HUFFCO, a Production Sharing Contractor (PSC) of Pertamina, discovered a huge natural gas reserve at Badak Field, East Kalimantan in February 1972. On November 26, 1974, PT Badak NGL, a non-profit company with the Shareholders of Pertamina, VICO and JILCO was set up. This company is entrusted to operate and maintain the Badak LNG Plant. In 1980, construction commenced on Train C and D as LNG demand increased from the Japanese buyers. The of the LPG extraction facilities in 1988. The refrigerated LPG production is also dedicated to Japanese export. Due to the continuous increase of LNG demand in Japan, Taiwan, and Korea, then Train E was constructed in 1987-1989, while Train F was constructed in 1991-1993. Since 1992 some LNG productions from this LNG Plant have also been exported to South Korea. The development of the Badak LNG Plant had been continued by the construction of the Train G that was completed in 1997 and Train H which was completed in the end of 1999. By 8 train's operation, the production capacity is able to reach into ± 22.5 million tons LNG/year. In entering the third millenniums, the Badak LNG plant has developed and able to produce the biggest LNG production in the world. Up to December 13, 2011, Badak LNG plant had shipped the 8,000 LNG cargoes. To maintain buyers' confidence for gas reserve quantity, a 42" pipe line is added. Four parallel pipelines which able to ship 3,600 million standard cubic feet (MMSCFD) natural gas to the plant for further process. Finally, Badak LNG plant become one of LNG plants with great experience in the world LNG industry, and become a vital asset for Indonesian LNG business chain. With all abilities, and experience for more than 40 years in producing LNG, Badak LNG ready to face any challenge in the 21st century, with strong and continuous support from all parties involved in LNG business.
公司 | Badak LNG |
---|---|
职位 | Scheduler - Worked at Production Division Maintenance Department |
地点 | Indonesia |
http://www.linkedin.com/in/leryandriyanto | |
部门 | master_operations |
头衔 | Scheduler - Worked at Production Division Maintenance Department |
Badak LNG Scheduler - Worked at Production Division Maintenance Department
2018-12-01 -
Badak LNG Lead Web Engineer - Worked at Bussiness Support.Div Information Technology Department
2018-08-01 - 2018-12-01
Badak LNG System Administrator Engineer Asst - Worked at Bussiness Support.Div Information Technology Dept
2009-02-01 -
Badak LNG Web Engineer Assistant - Worked at Development.Div Information Communication System Dept
2008-01-01 - 2009-01-01
Badak LNG Manufacturing Budget & Cost Control - Worked at Manufacturing Division Maintenance Department
2003-07-01 - 2008-08-01
Lery Andriyanto 在 Badak LNG 担任 Scheduler - Worked at Production Division Maintenance Department
Lery Andriyanto 在 Badak LNG 的职位是 Scheduler - Worked at Production Division Maintenance Department
Lery Andriyanto 的电子邮件地址是 ler***@***.***.id
Lery Andriyanto 的电话号码是 -
Lery Andriyanto 的公司电话号码是 +628****
Lery Andriyanto 在 oil & energy 工作。
Lery Andriyanto 的一些同事包括Feri Nugroho、Jhon Purba、Faiza Solehah、Fendy KusdiantoroLery Andriyanto、。
Lery Andriyanto联系方式: 电子邮件地址:ler***@***.***.id 电话号码:-
Lery Andriyanto 的个人领英是:http://www.linkedin.com/in/leryandriyanto
Lery Andriyanto 的办公地点:Wisma Nusantara 9th Floor, Jakarta, Jakarta Raya, ID, 10350
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd