电子邮件 | ema***@***.com | 获取Email |
---|
电子邮件 | ema***@***.com | 获取Email |
---|
With a staunch commitment to eliminate the menace of load shedding from the country, the Government of Punjab under the able leadership of the Chief Minister Punjab has taken the initiative of establishing a 1180 Mega Watt Power Plant in Bhikki, District Sheikhupura. The project is being established under the Power Policy 2015 of the Government of Pakistan and is being conceived as one of the leading initiatives with most efficient machines and lowest project cost. The Project is proceeding on a very fast track to meet its compressed completion timelines. The Bhikki plant is scheduled to start simple cycle operations by providing 800 MW of electricity before summer 2017 while the operations on combined cycle mode will commence from winter 2017 which will enhance the production to 1180 MW. The Bhikki Project shall use RLNG as its primary fuel and shall employ the highest efficiency machines to keep the cost of electricity to the end consumer at its bare minimum. The project has negotiated an un-matchably low EPC cost as compared to other like-wise projects in the country. The EPC Contract of the project has been awarded to M/s Harbin Electrical International Company of the People's Republic of China at a total cost of US$ 539,260,000. The EPC Contractor shall install the most efficient H-series gas turbines at the plant manufactured and guaranteed by the General Electric of USA. At present, no other power plant in the country claims to have so high thermal efficiency and such a low EPC cost. The Long Term Service Agreement (LTSA) is being signed separately between the Project Company and General Electric USA to take care of the operations & maintenance of the gas turbines after the commissioning of the project. The Steam Turbine and all other balance of plant / auxiliary equipment shall also comply with the international standards to ensure sustained quality and efficiency of the project throughout its operational life.
公司 | Quaid-e-Azam Thermal Power |
---|---|
职位 | Assistant Manager Tariff & Contracts |
地点 | Pakistan |
http://www.linkedin.com/in/ranauzmanashraf | |
部门 | master_legal |
头衔 | Assistant Manager Tariff & Contracts |
Quaid-e-Azam Thermal Power Assistant Manager Tariff & Contracts
2021-01-01 -
Quaid-e-Azam Thermal Power Finance Assistant
2015-07-01 - 2021-01-01
Assistant Manager Accounts
2014-03-01 - 2015-07-01
Fast Cables Assistant Manager Accounts
2008-04-01 - 2014-02-01
Rana Ashraf 在 Quaid-e-Azam Thermal Power 担任 Assistant Manager Tariff & Contracts
Rana Ashraf 在 Quaid-e-Azam Thermal Power 的职位是 Assistant Manager Tariff & Contracts
Rana Ashraf 的电子邮件地址是 ema***@***.com
Rana Ashraf 的电话号码是 -
Rana Ashraf 的公司电话号码是 -
Rana Ashraf 在 oil & energy 工作。
Rana Ashraf 的一些同事包括Rana Ashraf、Salman Shahid、Muhammad Naveed、Shafaq AfzalIqra Ashraf、。
Rana Ashraf联系方式: 电子邮件地址:ema***@***.com 电话号码:-
Rana Ashraf 的个人领英是:http://www.linkedin.com/in/ranauzmanashraf
Rana Ashraf 的办公地点:first floor, 7 c-1, gulberg iii, lahore, punjab, pakistan
Top-ranked on G2 Crowd
全球B2B企业库 海关贸易数据 展会采购数据
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd