电子邮件 | tra***@***.com | 获取Email |
---|
电子邮件 | tra***@***.com | 获取Email |
---|
As Ontario's largest clean electricity generator, OPG produces about half of the province's power using our diverse portfolio of publically-owned generating assets. Our nuclear stations are the clean-power workhorses in our fleet. We rely on them to produce stable base load energy with virtually no air pollution. To maintain these valuable assets, we have started work on Canada's largest clean energy project - the mid-life refurbishment of the Darlington Nuclear Generating Station (GS). We're also investing in the Pickering Nuclear GS to ensure it continues safely operating until 2024. In 2014, OPG burned its last piece of coal to make electricity. It was North America's largest climate change action to date. We refueled two of our thermal stations with biomass, which provides Ontario with renewable, dispatchable power. It also optimized the use of existing public assets. We completed converting Atikokan GS in July 2014, and the Thunder Bay GS conversion to advanced biomass followed soon after in January 2015. Hydroelectric power is a renewable resource that has fueled Ontario's economic growth since the beginning of the 20th century. Today, it accounts for more than one-third of OPG's electricity production. More than half of our hydro stations are over 80 years old, but thanks to ongoing maintenance and upgrades, they remain important contributors of clean, low-cost power in the province. OPG works efficiently and to the highest standards of safety. We strive to deliver all projects on time and budget. We conduct all aspects of our business openly, honestly and with integrity. And we look beyond the bottom line to support the wellbeing of this province by generating power with purpose.
公司 | Ontario Power Generation |
---|---|
职位 | Director |
地点 | Canada |
http://www.linkedin.com/in/tracy-leung-406403b | |
部门 | |
头衔 | Director, Pickering 58 Refurbishment Project |
Ontario Power Generation Director
2022-12-01 -
AACE International Chair of the Women In Projects Controls Committee of AACE International
2022-06-01 -
AACE International Board Member AACE Toronto Section
2021-11-01 -
Ontario Power Generation Director, Project Services
2020-09-01 - 2022-12-01
Ontario Power Generation Manager, Project Controls (Integration)
2016-02-01 - 2020-09-01
Tracy Leung 在 Ontario Power Generation 担任 Director, Pickering 58 Refurbishment Project
Tracy Leung 在 Ontario Power Generation 的职位是 Director, Pickering 58 Refurbishment Project
Tracy Leung 的电子邮件地址是 tra***@***.com
Tracy Leung 的电话号码是 -
Tracy Leung 的公司电话号码是 +141****
Tracy Leung 在 utilities 工作。
Tracy Leung 的一些同事包括Jordan Tanner、Angela Mungo、Nicky Gleaves、Kim ShredGerry Stencell、。
Tracy Leung联系方式: 电子邮件地址:tra***@***.com 电话号码:-
Tracy Leung 的个人领英是:http://www.linkedin.com/in/tracy-leung-406403b
Tracy Leung 的办公地点:700 University Avenue, Toronto, ON M5G 1X6, CA
Top-ranked on G2 Crowd
全球B2B企业库 海关贸易数据 展会采购数据
全球B2B企业库
海关贸易数据
展销采购数据
Top-ranked on G2 Crowd