TRANSCO CLSG

Côte d'Ivoire · 43 Employees
The West African Power Pool (WAPP) organization was established by the highest decisionmaking body of ECOWAS, the Authority of Heads of State and Government of Member States, as a mechanism and institutional framework for integrating the national power systems of ECOWAS member countries. The objective of the WAPP is to establish a regional electricity market in West Africa through the judicious development and realization of key priority infrastructure that would permit the accessibility to economic energy resources, to all member states of the ECOWAS and help meet the energy needs of the ECOWAS citizens by providing least cost reliable and sustainable electricity supply for economic development. The Implementation Strategy of WAPP is based on developing complementary and mutually reinforcing infrastructure sub-programs, which will result in an integrated electricity system and market in West Africa. It is funded by the World Bank (WB), the African Development Bank (AfDB), the European Investment Bank (EIB) and the KFW. Among the infrastructure sub-programs to be developed by the WAPP, there is the electrical interconnection between Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG). This project aims to integrate these post-conflict countries in the regional electricity market created by the WAPP. In conformity with the above-mentioned enactment, the four countries have duly signed and ratified an International Treaty establishing a Regional Transmission Company (RTC) known as TRANSCO CLSG with the mandate to finance, construct, own, operate and further develop the CLSG transmission interconnector. CLSG project will give the following results: ● A 225-kV overhead transmission line of approximately 1,303 km across the four countries involved; ● Eleven (11) new 225 kV substations, five (5) in Liberia and one (1) in Guinea. ● Extension of an existing substation in Côte d'Ivoire; ● Installation of Static VAr Compensators at five substations

概述

国家 Côte d'Ivoire
成立时间 2012
总部 cote d’ivoire
电话号码
网站 http://www.transcoclsg.org
LinkedIn http://www.linkedin.com/company/transco-clsg
Twitter
Facebook
员工数 43
行业 oil & energy,
简介 The West African Power Pool (WAPP) organization was established by the highest decisionmaking body of ECOWAS, the Authority of Heads of State and Government of Member States, as a mechanism and institutional framework for integrating the national power systems of ECOWAS member countries. The objective of the WAPP is to establish a regional electricity market in West Africa through the judicious development and realization of key priority infrastructure that would permit the accessibility to economic energy resources, to all member states of the ECOWAS and help meet the energy needs of the ECOWAS citizens by providing least cost reliable and sustainable electricity supply for economic development. The Implementation Strategy of WAPP is based on developing complementary and mutually reinforcing infrastructure sub-programs, which will result in an integrated electricity system and market in West Africa. It is funded by the World Bank (WB), the African Development Bank (AfDB), the European Investment Bank (EIB) and the KFW. Among the infrastructure sub-programs to be developed by the WAPP, there is the electrical interconnection between Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG). This project aims to integrate these post-conflict countries in the regional electricity market created by the WAPP. In conformity with the above-mentioned enactment, the four countries have duly signed and ratified an International Treaty establishing a Regional Transmission Company (RTC) known as TRANSCO CLSG with the mandate to finance, construct, own, operate and further develop the CLSG transmission interconnector. CLSG project will give the following results: ● A 225-kV overhead transmission line of approximately 1,303 km across the four countries involved; ● Eleven (11) new 225 kV substations, five (5) in Liberia and one (1) in Guinea. ● Extension of an existing substation in Côte d'Ivoire; ● Installation of Static VAr Compensators at five substations

技术

Facebook Like Button

Social Sharing

Google Cloud Hosting

Hosting

Google Font API

Fonts

Microsoft Office 365

Other

Mobile Friendly

Other

Nginx

Load Balancers

Outlook

Email Providers

Remote

Other

WordPress.org

CMS

YouTube

Online Video Platforms

常见问题

TRANSCO CLSG 在哪里?

TRANSCO CLSG 的总部位于 cote d’ivoire

TRANSCO CLSG 的电话号码是多少?

TRANSCO CLSG 的电话号码是

TRANSCO CLSG 的官方网站是什么?

TRANSCO CLSG 的公司官方网站是 http://www.transcoclsg.org

TRANSCO CLSG 是做什么的?

TRANSCO CLSG 的业务有哪些?

own,construct,beyond,clsg countries,to finance,operate & maintain the regional power transmission facility to enable exchange of electricity betwe

TRANSCO CLSG 的年收入是多少?

TRANSCO CLSG 的收入是 0美元

TRANSCO CLSG 有多少员工?

TRANSCO CLSG 有 43 名员工

TRANSCO CLSG 属于哪个行业?

TRANSCO CLSG 从事以下行业: oil & energy

TRANSCO CLSG 使用什么技术?

TRANSCO CLSG 使用的一些流行技术包括: Facebook Like Button,Google Cloud Hosting,Google Font API,Microsoft Office 365,Mobile Friendly,Nginx,Outlook,Remote,WordPress.org,YouTube

如何联系 TRANSCO CLSG?

TRANSCO CLSG 联系信息: 电话号码:, 网站:http://www.transcoclsg.org, 邮箱:msh***@***.org

TRANSCO CLSG 的社交媒体链接是什么?

TRANSCO CLSG 领英:http://www.linkedin.com/company/transco-clsg,fackbook:,twitte:

TRANSCO CLSG 是一家上市公司吗?

不是

TRANSCO CLSG 的最后一轮融资是什么时候?

暂无最近投资信息

谁投资 TRANSCO CLSG?

TRANSCO CLSG 有 0 家投资者,包括 。

管理层

Jigba Yilla

Finance and Administration Manager

Paul S

Country Manager

Mohamed Keita

Senior Procurement & Contract Management Specialist

员工

M'balu Sesay

Social Safeguard Consultant

Mohammed Sow

Engineering and Contract Specialist

Kouame Yao

Ingénieur projet Energie

Mbalu Sesay

Social Safeguard

Abraham Bility

Change Management and Strategic Liaison Officer

外贸获客 查找关键决策人

10亿+海关交易数据,1.2亿企业数据,2亿+企业联系人数据,1000千万真实采购商。覆盖200+个国家及地区,95%外贸重点拓展市场,可根据行业、经营范围等多方位挖掘目标客户。
免费试用

Top-ranked on G2 Crowd

全球B2B企业库 海关贸易数据 展会采购数据

工作更少,成就更大,销售更聪明

查找更多 B2B 联系人,丰富并验证记录
Email Address

全球B2B企业库

海关贸易数据

展会采购数据

Top-ranked on G2 Crowd

OR
Sign Up with Google