Mbalu Sesay

. - Sierra Leone

Mbalu Sesay 的邮箱和电话

电子邮件 mse***@***.org

Mbalu Sesay 当前工作场所

TRANSCO CLSG

The West African Power Pool (WAPP) organization was established by the highest decisionmaking body of ECOWAS, the Authority of Heads of State and Government of Member States, as a mechanism and institutional framework for integrating the national power systems of ECOWAS member countries. The objective of the WAPP is to establish a regional electricity market in West Africa through the judicious development and realization of key priority infrastructure that would permit the accessibility to economic energy resources, to all member states of the ECOWAS and help meet the energy needs of the ECOWAS citizens by providing least cost reliable and sustainable electricity supply for economic development. The Implementation Strategy of WAPP is based on developing complementary and mutually reinforcing infrastructure sub-programs, which will result in an integrated electricity system and market in West Africa. It is funded by the World Bank (WB), the African Development Bank (AfDB), the European Investment Bank (EIB) and the KFW. Among the infrastructure sub-programs to be developed by the WAPP, there is the electrical interconnection between Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG). This project aims to integrate these post-conflict countries in the regional electricity market created by the WAPP. In conformity with the above-mentioned enactment, the four countries have duly signed and ratified an International Treaty establishing a Regional Transmission Company (RTC) known as TRANSCO CLSG with the mandate to finance, construct, own, operate and further develop the CLSG transmission interconnector. CLSG project will give the following results: ● A 225-kV overhead transmission line of approximately 1,303 km across the four countries involved; ● Eleven (11) new 225 kV substations, five (5) in Liberia and one (1) in Guinea. ● Extension of an existing substation in Côte d'Ivoire; ● Installation of Static VAr Compensators at five substations

Mbalu Sesay 简介

公司 TRANSCO CLSG
职位 Social Safeguard
地点 Sierra Leone
LinkedIn http://www.linkedin.com/in/mbalu-sesay-6815996a
部门
头衔 at

Mbalu Sesay 的常见问题(FAQs)

Mbalu Sesay 在哪家公司工作?

Mbalu Sesay 在 TRANSCO CLSG 担任 at

Mbalu Sesay 在 TRANSCO CLSG 的职位是什么?

Mbalu Sesay 在 TRANSCO CLSG 的职位是 at

Mbalu Sesay 的电子邮件地址是什么?

Mbalu Sesay 的电子邮件地址是 mse***@***.org

Mbalu Sesay 的电话号码是什么?

Mbalu Sesay 的电话号码是 -

Mbalu Sesay 的工作电话号码是什么?

Mbalu Sesay 的公司电话号码是 -

Mbalu Sesay 从事哪个行业?

Mbalu Sesay 在 oil & energy 工作。

Mbalu Sesay 的同事是谁?

Mbalu Sesay 的一些同事包括M'balu Sesay、Mohammed Sow、Kouame Yao、Mohammed SherifMbalu Sesay、。

我如何联系 Mbalu Sesay?

Mbalu Sesay联系方式: 电子邮件地址:mse***@***.org 电话号码:-

Mbalu Sesay 的个人领英是多少

Mbalu Sesay 的个人领英是:http://www.linkedin.com/in/mbalu-sesay-6815996a

Mbalu Sesay 的办公地点在哪里?

Mbalu Sesay 的办公地点:cote d’ivoire

同名人员

Mbalu Sesay

Commercial Assistant

外贸获客 查找关键决策人

10亿+海关交易数据,1.2亿企业数据,2亿+企业联系人数据,1000千万真实采购商。覆盖200+个国家及地区,95%外贸重点拓展市场,可根据行业、经营范围等多方位挖掘目标客户。
免费试用

Top-ranked on G2 Crowd

全球B2B企业库 海关贸易数据 展会采购数据

工作更少,成就更大,销售更聪明

查找更多 B2B 联系人,丰富并验证记录
Email Address

全球B2B企业库

海关贸易数据

展销采购数据

Top-ranked on G2 Crowd

OR
Sign Up with Google